This is default featured slide 1 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 2 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 3 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 4 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

This is default featured slide 5 title

Go to Blogger edit html and find these sentences.Now replace these sentences with your own descriptions.

Sunday, June 2, 2019

Level 3 Tendering, Procurement and Contract Management



       Tendering


1.               Introduction to tender.
2.              Preparation of tender document.
3.              Tendering document submission guidelines.
4.              Tendering & bidding process.
5.              Brief detail of  different formats of tender document as type of work.
6.              Training on live project.

 ·                Contract management 


1.                Introduction to type of contract.
2.                Brief detail of contract document.
3.                Boq prepration techniques.
4.                Brief detail of contract tracker format.
5.                Introduction of different format after post contract.
6.                Understanding the role of contract management in construction site.

Level 2 Billing Engineering

Billing Engineering is the Billing of quantities (BoQ) which is prepared by the Quantity Surveyor and  it is made in excel sheet for all types of tender works in all types of constructions which includes material, parts, labours and their costs.

It also details the work and conditions of working for the project and itemizes all the work to enable a contractor to consider the risk and bid accordingly..
Also after the work is completed, the material, and the labour charges due of the contractor are paid to him accordingly which is also referred to as billing.

Billing Engineering

  • Introduction to Billing Engineering.
  • Type Of Bills In Construction Work.
  •  Billing As Per Contracts.
  • Measurement Book and Abstract Book.
  • How to make R.A. Bills.
  • How to make Abstract cost and DNIT.
  • How to make Sub Contractors Bills.
  • Procedure of payment.
  • Bills Preparation as IS Codes and latest CPWD Specification.
  • Training on Ongoing Projects.